Project | Port of Everett 10th Street Boat Launch Maintenance Dredging |
---|
Date | January 2022 |
---|
Location | Port of Everett Boat Launch - 607 10th St, Everett, WA |
---|
Project Summary
For this project, American Construction is removing up to 41,000 cubic yards (cy) of river sediment that has settled in the boat launch basin and 9,000 cy of sediment from the connector channel between the boat launch and the federal navigation channel.