The project entails dredging of up to 71,000 cubic yards of material per dredging event from the federally authorized footprint of the Duwamish River navagational channel and turning basin (River Miles 4.8-5.5) with disposal at the Dredge Material Management Program's (DMMP) open-water disposal site in Elliott Bay.