Eastside Treatment Plant Outfall Replacement

ProjectEastside Treatment Plant Outfall Replacement
Date2018
LocationWashington Narrows, Bremerton, WA
Contract$1,700,000

Project Summary

Remove approximately 250 LF of an existing 20-inch outfall pipe and replace it with a new 36-inch outfall pipe.  The work includes sheet pile shoring, excavation, backfilling and the installation of an end diffuser check valve.

 
John Blair, Project Manager
John Blair, Project Manager
Kris Clark, Operator
Kris Clark, Operator